Skip to content

A routine built for your gym.And a friend on the same one.

Pick a program and every session arrives built from the kit you actually have. Then put someone on it with you — that is the part that makes you keep going.

Coming soon to theApp StoreSee how it works

Free. No ads. Your friend list is the whole feed.

The Creed Today screen: one obvious action, calorie and macro rings, and the day's meals.
  • 8
    routines to follow
  • 323
    movements, drawn
  • 2
    people per streak
  • 4
    characters to add a friend
The Train tab: the current split, program progress and a muscle coverage line.
Train
The Feed with two friends training live, each with a session in progress.
Feed
The path of sessions, laid out as units you work down one node at a time.
The path
The Fuel tab with calorie and macro rings above the day's meals.
Fuel
The weekly league table, ranking you against your friends.
League
Progress charts in dark mode, showing volume and bodyweight over time.
Progress
The badge shelf in dark mode.
Badges
The home screen widget gallery at true widget sizes.
Widgets

Swipe. These are real captures, not mockups.

Start here

Eight routines. Pick one and stop deciding.

Three days a week to six, six weeks to twelve. Every session is written out — and each slot is a movement pattern rather than a fixed exercise, so Creed fills it from whatever your gym has on the floor that day.

Then put someone on the same one. You see how far in they are, they see you, and the week only counts when you both train.

The library

323 movements.
Every one of them drawn.

Not stock photos and not a wall of text. The mascot performs each movement, so you can tell a Romanian deadlift from a good morning at a glance, mid-set, at arm's length.

Equipment aware

It knows what your gym actually has.

Tell Creed where you are training — full gym, hotel rack, a set of bands in a suitcase. The session re-resolves around what is in the room. Same stimulus, different hardware, no editing.

Full gym
Bands only

Barbell bench press → band chest press. Chest day survives.

Fuel

Food, without the ledger.

Photograph the plate. Creed itemises it and shows you the working. Nothing is logged until you approve it — no silent guesses landing in your day. Macro targets, meal plans, done.

  • Photo recognition, itemised
  • Protein, carbs and fat targets
  • Meal plans that match your week
  • Nothing logs without a yes
The Fuel tab: calorie and macro rings above the day's logged meals.
An AI meal review, itemising a photographed plate before anything is logged.
The whole thesis

Every app can count your sets.
None of them notice when you stop.

Creed puts one other person inside the loop. Not a leaderboard of strangers — one friend, whose week is tied to yours.

Pair streaks

A streak with someone else’s name on it.

Both of you train this week or it doesn’t move. Skip it and your friend loses it too. Forgiving by day. Strict by week. It turns out that is the difference.

11
weeks
M
T
W
T
F
S
S

Three days. One week. The chain holds.

Live presence

You’ll know the second they start.

Presence is live. A friend racks the first set and it shows up on your Today screen. Send a cheer while they are still under the bar — it lands on their watch, mid-rest.

The live rail expanded, showing friends currently training and how far into their session they are.
Written by a friend

Let someone else do the deciding.

A friend can plan your session for you. It arrives as a card. Accept it and it is your workout for the day. A plan is just the deciding, done early — and done by someone who is not tired yet.

Maya wrote you a session
Push · 4 movements · ~55 min
  • Barbell bench press4 × 5
  • Incline dumbbell press3 × 8
  • Landmine press3 × 10
  • Rope pushdown3 × 12
AcceptLater
Share cards

Every session renders to a picture.

1080 × 1350, the mascot doing your heaviest movement, your numbers, and your friend code sitting at the bottom. Post it or don’t. It works either way, because the code is the only onboarding anyone needs.

Friend codes
CREED-KF4DFour characters. Redeem one and you land already friends — no request, no waiting.
Chest day · 62 minPR
225
lb bench · 3 × 5
18
sets
24.6k
lb moved
9
pair streak
Train with meCREED-KF4D

Example card. Yours has your numbers on it.

Leagues

A table small enough to care about.

You and your friends, weekly. Sets and meals move you up it. Nobody is ranked against a stranger in another timezone with a coach and no job.

Questions people actually ask.

What is a pair streak?
A streak that belongs to two people instead of one. You both have to train in the same week for it to advance — which days does not matter. Skip, and your friend loses it too. That is the whole point: a number you can lose alone is easy to abandon.
Is Creed free?
Yes. Free, no ads, no subscriptions, and your friend list is the whole feed — there is nobody to discover and no algorithm deciding what you see.
What if my gym does not have the equipment?
Tell Creed which gym you are in and it only ever shows movements that gym can actually do. When something is taken it swaps down a ranked list of alternatives for the same pattern, all the way to a bodyweight or band version that needs nothing.
Can a friend write my workout?
They can. A friend can plan a session for you and send it over, and it arrives as a card you accept or ignore. They can also see the moment you start training and cheer you mid-set.
Does it track food too?
It does. Calories and macros, with photo recognition for the meals you cannot be bothered to search, plus meal plans a friend can write for you the same way they write workouts.
How many exercises are in it?
323 movements, each one illustrated rather than photographed or described in a paragraph. Browse the whole library at getcreed.app/movements.
Is there an Android version?
Not yet. Creed is iPhone only for now.
Do I need friends on it to use it?
No — the training, the food logging and your own streak all work on their own. But pair streaks, live presence and duels need a second person, and those are the parts that keep people coming back.

Pick the routine. Bring the friend.

A program built for your gym, the food beside it, and someone on the other end of the streak. A routine you'll actually follow.

Coming soon to theApp Store